How to work with a Spanish architect
Your architect is your most important adviser when you build in Spain. Good cooperation comes down to clear agreements, good drawing rounds and communication that works even when you do not share a language.
Last updated:
The architect's role in Spain
In Spain the architect has a larger formal role than many foreign clients expect. The architect prepares the project, handles approvals and – together with a building engineer (arquitecto técnico or aparejador) – is responsible for supervising the site. Choosing an architect is therefore also choosing who looks after quality during construction.
The stages of a typical commission
Most commissions follow roughly this order:
- Sketches and outline design (anteproyecto): brief, siting, character and a rough budget
- Permit project (proyecto básico)
- Construction drawings and specifications (proyecto de ejecución), the basis for tenders and building
- Help with tenders and choosing a builder
- Site supervision (dirección de obra) until the completion certificate
Fees and contract
Fees are often a percentage of the building budget or a fixed sum per stage. Agree in writing what is included: number of drawing rounds, visado, geotechnics, safety coordinator, supervision and site visits – and what changes cost.
Ask for a payment schedule tied to deliverables, not just dates. Then you pay for what has actually been delivered.
Drawing rounds without misunderstandings
The most expensive mistakes happen when a change is misunderstood. A few simple habits help:
- Comment directly on the drawing – put a marker on the spot instead of describing it in words
- Keep one thread per topic (the terrace, the kitchen, the windows) so the answer stays with the question
- Ask for each new revision to be clearly labelled (R1, R2 …) with a short list of what changed
- Confirm important decisions in writing, with the date
When you do not share a language
Many architects on the coast speak English, but the nuances of technical discussions get lost easily. It is better for each side to write in their own language and have it translated with the right building vocabulary than for both to write in a third language neither fully masters.
In MinePlaner you write in English and your architect reads Spanish – and the other way round. The original text is always available, you can refer to photos and put markers on the drawing, and the architect can reply with sketches and PDFs. Both of you get e-mail notices in your own language.
Prepare for the first meeting
The better prepared you are, the faster the architect gets going – and the fewer drawing rounds you need. Bring:
- Your brief: how many bedrooms and bathrooms, how you use the kitchen and living room, office, storage and guest rooms
- The budget – including the limit you do not want to pass – so the proposals stay realistic
- Photos of houses, materials and solutions you like, and of what you do not like
- The plot documents: deed, nota simple, any survey and information from the town hall
- Priorities: views, sun, privacy, pool, accessibility
- Your timetable and when you can travel out yourselves
The architect during construction
Once building starts, the architect and the building engineer are your eyes on site. Agree how often they will be there, how you will get reports (ideally with photos) and who approves changes. Ask that any change affecting price or time is always confirmed in writing before it is carried out – it saves surprises on the final invoice.
Share only what the architect needs
Your architect needs drawings, documents and photos of the plot – not the family pictures. Give the architect a personal link that shows exactly that: less noise and faster answers. The family can have their own presentation with the nice photos.
Frequently asked questions
How much does an architect cost in Spain?
Fees are agreed freely and are often a percentage of the building budget or fixed amounts per stage. Ask for an offer that lists the stages, visado, supervision and what changes cost.
What is visado?
Visado is the college of architects' check of the project: that the architect is qualified and the project formally in order. It is compulsory for the construction project (proyecto de ejecución) of a home and for the completion certificate; the permit project is only approved if the town hall asks for it.
Does my architect need to speak English?
No. With automatic translation each side can write in their own language. Important decisions should still be confirmed in writing.
How do I give my architect access without an account?
Create a personal link with the architect's name, e-mail and language. The architect sees only what the link shows and can write messages, comment on drawings and upload sketches – no login.